Certified Cable Test Technician Training
CertiFiber® Pro Checklist
Below are the steps that should be followed each time you use the CertiFiber® Pro to certify fiber cabling
-
Turn on Versiv Mainframe
-
Turn on Versiv Remote
-
Ensure Date and Time are set to current values
-
Create new project
-
Add Operator name and CCTT Certification Number to Operator list
-
Create required Tests
-
Verify Cable Type
-
Verify Test Limit
-
Set Reference Method to 1 Jumper
-
Verify Connector Type
-
For Length Based Limits, enter number of Connections and Splices
-
Create required Cable IDs
-
Starting and Ending IDs must be same number of characters
-
Select media type
-
Select tests to be run for each Cable ID
-
Set Reference
-
Allow sources to warm up, at least 5 minutes
-
Follow Wizard for 1 Jumper Reference
-
Set Reference Ranges:
-
62.5/125 µm: -18.5 dBm to -20.00 dBm
-
50/125 µm: -23.50 dBm to -25.00 dBm
-
9/125 µm: -2.5 dBm to -4.00 dBm
-
Verify Test Reference Cords
-
Multimode ≤ 0.15 dB
-
Singlemode ≤ 0.25 dB
-
Select first test to be run
-
Select corresponding Cable IDs
-
Enable Auto Save, if testing in order
-
Start testing
-
Periodically export results to LinkWare Live, USB Drive, or LinkWare PC