top of page

CertiFiber® Pro Checklist

Below are the steps that should be followed each time you use the CertiFiber® Pro to certify fiber cabling

  • Turn on Versiv Mainframe

  • Turn on Versiv Remote

  • Ensure Date and Time are set to current values

  • Create new project

  • Add Operator name and CCTT Certification Number to Operator list

  • Create required Tests

  • Verify Cable Type

  • Verify Test Limit

  • Set Reference Method to 1 Jumper

  • Verify Connector Type

  • For Length Based Limits, enter number of Connections and Splices

  • Create required Cable IDs

  • Starting and Ending IDs must be same number of characters

  • Select media type

  • Select tests to be run for each Cable ID

  • Set Reference

  • Allow sources to warm up, at least 5 minutes

  • Follow Wizard for 1 Jumper Reference

  • Set Reference Ranges:

  • 62.5/125 µm: -18.5 dBm to -20.00 dBm

  • 50/125 µm: -23.50 dBm to -25.00 dBm

  • 9/125 µm: -2.5 dBm to -4.00 dBm

  • Verify Test Reference Cords

  • Multimode ≤ 0.15 dB

  • Singlemode ≤ 0.25 dB

  • Select first test to be run

  • Select corresponding Cable IDs

  • Enable Auto Save, if testing in order

  • Start testing

  • Periodically export results to LinkWare Live, USB Drive, or LinkWare PC

bottom of page